首页 社会内容详情
以太坊开奖网:KPower gets four-year PPA extension

以太坊开奖网:KPower gets four-year PPA extension

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠开户的平台。皇冠开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

以太坊开奖网www.326681.com)采用以太坊区块链高度哈希值作为统计数据,以太坊开奖网(联博统计)数据开源、公平、无任何作弊可能性。联博统计免费提供API接口,支持多语言接入

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

发布评论